Current projects

  • Mill Street Streetscape

    Wider sidewalks, 28 street trees, curb ramps and a new water main between 2nd and 4th. $6.2 million.

    Construction
  • Quarry Road Reservoir

    A 2-million-gallon water tank to keep pressure steady on the east side. $9.8 million.

    Design
  • Kestrel River Greenway, Phase 3

    1.8 miles of path from Heron Park to Cedar Hollow. $3.4 million, half from a state grant.

    Construction
  • Safe Routes to School: Pine Ridge Elementary

    New sidewalks and a flashing crosswalk on Pine Ridge Road. $780,000.

    Construction
  • Downtown Parking Study

    Counts, surveys and recommendations for downtown parking.

    Study
  • Heron Park Riverbank Restoration

    Native plants and large logs placed along 900 feet of riverbank to shade salmon.

    Complete