Projects Around Town
What is being built, what it costs, when it will be done and who to call with questions.
Current projects
- Construction
Mill Street Streetscape
Wider sidewalks, 28 street trees, curb ramps and a new water main between 2nd and 4th. $6.2 million.
- Design
Quarry Road Reservoir
A 2-million-gallon water tank to keep pressure steady on the east side. $9.8 million.
- Construction
Kestrel River Greenway, Phase 3
1.8 miles of path from Heron Park to Cedar Hollow. $3.4 million, half from a state grant.
- Construction
Safe Routes to School: Pine Ridge Elementary
New sidewalks and a flashing crosswalk on Pine Ridge Road. $780,000.
- Study
Downtown Parking Study
Counts, surveys and recommendations for downtown parking.
- Complete
Heron Park Riverbank Restoration
Native plants and large logs placed along 900 feet of riverbank to shade salmon.