Engineering
Engineering designs the Town's streets, pipes and trails, reviews private development, and keeps the master plans current.
Capital improvement plan
The five-year plan for 2026 – 2031 sets aside $48 million for streets, water, sewer, stormwater and parks. The biggest projects are the Mill Street Streetscape, the Quarry Road Reservoir and Phase 3 of the Kestrel River Greenway.
Development review
We check grading, drainage, utilities and street improvements on private projects and inspect the work in the field. Erosion control is required on any site that disturbs more than 500 square feet.
Master plans
- Transportation System Plan (2024)
- Water Master Plan (2023)
- Sanitary Sewer Master Plan (2022)
- Stormwater Master Plan (2025)
- Accessibility (ADA) Transition Plan for streets and sidewalks (2025)
Contact
Engineering
1-800-555-0122
[email protected]
Visit
Town Hall, 200 Mill Street
Hours
Monday – Friday, 8 a.m. – 5 p.m.